ID-201Interior design systems

Interior design systems for new construction

Selections made late turn into change orders. For builders across Nashville and Middle Tennessee, Native Plans does new construction interior design that starts with the plans: finishes, fixtures and materials chosen alongside the floor plan, then documented in one package with specifications and purchasing information, so decisions land before rough-in.

Kitchen with green shaker cabinetry, an oak pantry wall, a white waterfall island with oak stools, brass schoolhouse pendants and a black range hood.
Westboro Dr, Nashville

ID-202Why it matters in the field

A late selection gets paid for twice.

  1. 01

    Rough-ins set to the real fixture

    Tub, shower valve, vanity heights and lighting are known before rough-in, so nothing moves after inspection.

  2. 02

    Purchasing on your schedule

    Long-lead items are flagged while there's still time to order them without holding up a trade.

  3. 03

    Budget held at the selection

    The selections most likely to move come with a lower-cost alternate, so a swap doesn't turn into a redesign.

ID-203What's in the package

What's in a new construction interior design package.

Package scope is set for each project. A package can include:

Lighting schedule board with chandeliers, pendants and sconces labeled by room: living, kitchen island, dining, primary bedroom, primary closet and secondary bedrooms.
Lighting schedule board
What's in a new construction interior design package.
SheetDocumentWhat your team gets
ID-001Design directionPalette, materials and reference images agreed with you before anything gets specified.
ID-101Finish plansAvailable when the project needs them: floor, wall and ceiling finishes located room by room, with transitions marked.
ID-201Finish scheduleEvery finish by room: product, color, size and pattern, in one table your field and purchasing teams work from.
ID-301Fixture and finish specificationsPlumbing fixtures and hardware with manufacturer, model and finish. Lighting and appliance specifications are available when the project needs them.
ID-401Interior elevationsAvailable when the project needs them: kitchen, baths, built-ins and fireplace walls, drawn so cabinetry, tile and millwork can be priced.
ID-501Purchasing informationSources, quantities and order notes for each selection your team buys.
ID-601Budget alternatesA lower-cost alternate for the selections most likely to move, so you can hold the number without redesigning the room.

ID-204Selections to finished room

The selection board, then the kitchen.

Cabinet colors, the quartz and its waterfall edge, the backsplash run to the ceiling, the hood, the hardware and the island pendants, all decided on one board before the kitchen was built.

Kitchen selection board: green and honey shaker cabinet doors, Palisades Gold quartz with a waterfall edge, a glossy tile backsplash run to the ceiling, a black range hood, brass hardware, schoolhouse island pendants and wood shelf brackets.
Wide view of the same kitchen: white waterfall island with oak stools under brass schoolhouse pendants, green cabinetry and a black range hood, the dining area beyond.
Selection boardFinished kitchen
Selection board, and the kitchen on Westboro Dr, Nashville.

ID-205Coordination

Selections that fit the plan.

The interiors package is drawn alongside the plan set. Cabinet runs, appliance widths, shower sizes and fixture locations are set once and carried into both documents.

Exterior selections such as brick, windows and doors come from the same palette as the interiors, so the house reads as one design inside and out.

A-101Residential plansID-201Interior design systemsL-101Landscape & exterior designONE COORDINATED SETA-101ID-201L-101ONE COORDINATED SET

ID-206Scope by project type

Who the selections are for.

  1. 01

    Custom

    A guided sequence of decisions with the owner, documented as you go, so the builder always has the current selection.

  2. 02

    Spec

    Finishes chosen for the buyer at that price point. Repeated where it saves money, changed where it sells the house.

  3. 03

    Infill and community

    Finish packages that repeat across lots with controlled variation, so purchasing can buy in volume and each house still reads as its own.

Visualization of the Forest Lawn kitchen: an oak working island and a quartz-topped island, limewash cabinetry wrapping an arched range hood, brass pendants and oak ceiling beams.
Visualization of the Forest Lawn kitchen finishes

ID-201From the Forest Lawn set

The Forest Lawn interior package.

Calais by Fabrica flooring in Normandy Oak and SW 7008 Alabaster throughout. In the kitchen, a stone oak working island and a bar island under Bianco Drift quartz, with Limewash shaker cabinetry wrapping a custom range hood. In the living room, a white cast stone fireplace surround, an Avalon brick firebox, Tinsmith Gray shiplap and Acier built-ins under Acorn Brown beams.

See the Forest Lawn set

ID-207Questions

Questions about interiors.

Read all questions
What is a schedule of finishes?

A schedule of finishes, or finish schedule, lists every finish in a house room by room, including flooring, paint, tile, countertops and trim. It also marks where each finish starts and stops, and it's the document the field and purchasing work from.

Our finish schedule guide includes a free template.

When do selections need to be final to protect the schedule?

Before the trade that builds around them starts. Anything that affects framing, blocking or rough-in (tubs, shower systems, vanities, appliances, lighting and cabinetry) has to be settled before those crews arrive, and long-lead items need to be ordered early enough to arrive before they're installed.

Native Plans builds a selections timeline around your build schedule, so each decision has a date. When to make selections in a new build.

Do you provide purchasing information and budget tracking?

Yes. The Native Plans interiors package includes sources, product details and quantities for the selections, organized so your purchasing team can order from it. We track selections against your budget targets and offer lower-cost alternates where a selection runs over.

When should I hire an interior designer for a new build?

At the start, alongside the plans. Interior decisions change the plan: cabinet runs, appliance widths, shower sizes, fixture locations and ceiling details. Made after the plans are done, they come back as revisions or change orders.

Native Plans develops the interiors package with the plan set so those decisions get made once.

Does Native Plans install finishes or manage construction?

No. Native Plans designs and documents the interiors, and your builder and trades build and install them. We provide the specifications and purchasing information they work from. Support during construction, such as answering questions about the design, is agreed in the scope for each project.

How much does Native Plans charge?

Native Plans quotes each project after a short call, from the size and complexity of the house, which services you need, how many review rounds the scope includes and whether we start from your existing plans.

Design that repeats across lots changes the number too. We don't publish a rate card. Once we've talked, we recommend a scope and price it, so you're comparing a real number against a defined set of deliverables.

Make the decisions before construction makes them for you.

Tell us about the project and where it sits in your build schedule. We'll recommend an interiors scope that fits the time left before rough-in.

Two more short steps after this. We only use your email to follow up on your project. Privacy policy